Office expansion in progress

POSTMKTG’s flood-accelerated expansion is well underway. Just nine days after being washed out by a freak leak from the apartment above, our contractors are hard at work.

Today, we broke into the old break room, adding some much needed space, and restoring, as it turns out, a hole that had been there once before.

Breaking through to the breakroom

We moved the common refrigerator and microwave to the casket elevator down the hall.